Pilot Testing Measures
Click on the pins to learn more about the activities in the different municipalities or download the full report below:
Download report
Industrial waste heat utilization with a heat pump in DH network (Ilmajoki/Kurikka)
Upgrade to low temperature district heating in Karlova district (Tartu)
Low temperature centralised heat supply system of Beļava village (Gulbene)
Collection and analysis of data on heat supply, heat losses and heat consumption (Petrozavodsk)
Development of technical documentation for modernisation of energy saving measures (Petrozavodsk)
Lowering the operating parameters of the installation in existing oversized building (Wejherowo)
Tests on groundwork and innovative piping (Halmstad)
Mørkøv Varmeværk (Mørkøv)
Low temperature system for kindergarden (Alūksne)
Modernization of a gas boiler room with the use of an absorption heat pump (Rumia)